Select Year

STIP

Add A CommentComments And ResponsesZoom To ProjectProposed Year Of ConstructionCountyRouteBegining Milepost(s)Length (In Miles)Project NumberAscendingGeneral LocationDetail LocationCharacter Of WorkCharacter Of Work DescriptionExample Of Character Of WorkEstimated Cost
ResponsesZoom to Point2020AlbanyWY 12 0.0212.20104064LaramieHerrick Lane/Wy 12Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$4,400,000
ResponsesZoom to Point2024AlbanyWY 13 0.008.040105014Mcfadden to Rock RiverAlbany County Section/Wy 13 Structure No. CivPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$5,300,000
ResponsesZoom to Point2023AlbanyWY 34 0.009.70109026Bosler to WheatlandWy 34Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$5,700,000
ResponsesZoom to Point2023PlatteWY 34 45.107.10109027Bosler to WheatlandWy 34/Wy 312 JunctionPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$2,900,000
ResponsesZoom to Point2019Big HornWY 31 19.202.890201018Manderson to HyattvilleAlkali Creek SectionPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$1,500,000
ResponsesZoom to Point2019Big HornWY 31 5.4900201019Manderson to HyattvilleManderson-Hyattville/Wy 31 Structure East Of MandersonDrainage RepairWork to address erosion, flood, or other water related damageflood repairs to slopes, riprap repair or replacement, pipe inlet or outlet repairs, cleaning out culverts and ditches, replacing damaged culverts, debris removal$200,000
ResponsesZoom to Point2022JohnsonI 25 , US 87 244.009.070255095Casper to KayceeTtt Section I-25 Northbound Lane Structure No. Ajt, Ajv, Ajy, Aka, Akc, AkePavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$10,000,000
ResponsesZoom to Point2019CampbellSKYLINE DR, WY 50 3.012.070300039GilletteLakeway Road South SectionReconstructionWork to rebuild or expand current roadway or bridgesremoving and rebuilding roads and structures$8,400,000
ResponsesZoom to Point2023CampbellWY 50 36.0016.670300048Gillette to Pine Tree JunctionWy 50Additional LanesProjects to improve capacity and/or mobilitypassing lanes, additional through lanes, truck lanes, climbing lanes, multi-lanes$9,900,000
ResponsesZoom to Point2019CampbellSKYLINE DR, WY 50 3.01.960300A03GilletteWy 50-Lakeway South Section Campbell County ArsCommunity DevelopmentEnhancements projects (non-highway related work)pedestrian and bicycle facilities, recreational trails, pathways, safe routes to school projects, community improvements, environmental mitigation related to transportation, entry signs, decorative railing or lighting$300,000
ResponsesZoom to Point2020CampbellUS 14 , US 16 88.0200302089Buffalo to GilletteWildcat Creek, Structure No. Clf Us 14/16Bridge ReplacementReplacement of existing bridgenew bridge, large culvert, or reinforced box culvert $1,900,000
ResponsesZoom to Point2020CampbellUS 14 , US 16 96.1400302090Buffalo to GilletteRawhide Creek, Structure No. Clh Us 14/16Bridge ReplacementReplacement of existing bridgenew bridge, large culvert, or reinforced box culvert $2,500,000
ResponsesZoom to Point2022SheridanUS 14 27.645.860302091Ucross* Northeast; Us 16 JunctionPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$3,900,000
ResponsesZoom to Point2019CarbonWY 70 6.044.940401037Dixon to EncampmentSavery/Wy 70 West SectionPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$2,100,000
ResponsesZoom to Point2023CarbonWY 70 10.985.920401038Dixon to EncampmentSavery/Wy 70 East Section Structure No. Bly, JcpPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$2,800,000
ResponsesZoom to Point2023CarbonWY 72 12.373.610404014Hanna to Elk MountainWy 72 SouthPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$2,800,000
ResponsesZoom to Point2023CarbonWY 72 15.2000404015Elk MountainElk Mountain ShopPavement ResurfaceCorrect functional pavement deficiencies (IRI/rutting/thermal cracking)thin overlay (2" or less), microsurface, chip seal$100,000
ResponsesZoom to Point2023CarbonWY 72 0.003.020412008HannaElmo; Wy 72 NorthPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$1,300,000
ResponsesZoom to Point2020ConverseWY 59 SVRD 0.00.610510001Douglas to GilletteDouglas North Wy 59 Service RoadPavement ResurfaceCorrect functional pavement deficiencies (IRI/rutting/thermal cracking)thin overlay (2" or less), microsurface, chip seal$300,000
ResponsesZoom to Point2024CrookWY 116 0.005.630600018Sundance to UptonCundy Creek Section Wy 116ReconstructionWork to rebuild or expand current roadway or bridgesremoving and rebuilding roads and structures$2,300,000
ResponsesZoom to Point2021CrookUS 14 186.1010.860607036Devils Tower to SundanceUs 14Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$2,800,000
ResponsesZoom to Point2019FremontWY 135 17.256.90708028Riverton to Sand DrawBeaver RimPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$3,000,000
ResponsesZoom to Point2022FremontWY 135 28.406.190708029Riverton to Sand DrawBeaver Rim South; Wy 135Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$2,400,000
ResponsesZoom to Point2019GoshenWY 154 7.007.10803140VeteranVeteran NorthPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$3,500,000
ResponsesZoom to Point2024GoshenWY 154 14.109.020803141Veteran to YoderVeteran Road; Wy 154Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$3,200,000
ResponsesZoom to Point2019GoshenWY 92 7.466.6110807007TorringtonHunt Road/East Section/Wy 92 Structure No. CxxPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$3,200,000
ResponsesZoom to Point2019GoshenCR 47A 8.2000C07086Goshen CountyHorse Creek Structure No. EybBridge ReplacementReplacement of existing bridgenew bridge, large culvert, or reinforced box culvert $900,000
ResponsesZoom to Point2024LaramieWY 215 0.009.851104014Pine Bluffs to AlbinSouth Section; Wy 215Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$3,500,000
ResponsesZoom to Point2019LaramieWY 215 0.89, 1.6701104015Pine Bluffs to AlbinNorth Section/Wy 215 Structure No. Cro & CrnBridge ReplacementReplacement of existing bridgenew bridge, large culvert, or reinforced box culvert $1,900,000
ResponsesZoom to Point2022LaramieYELLOWSTONE RD, WY 219 2.0001108008CheyenneYellowstone Road-Four Mile Road Wy 219Traffic SystemsProjects to improve traffic movements new or replacement signal poles and devices, signing, signal heads, overhead signs and structures, pedestrian crossing devices, detection$400,000
ResponsesZoom to Point2023LaramiePARSON ST, US 30 401.761.261111003Pine Bluffs to NebraskaEast; Us 30Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$700,000
ResponsesZoom to Point2025LaramieI 80 SVRD 0.006.961123001Archer to HillsdaleI-80 Service RoadPavement ResurfaceCorrect functional pavement deficiencies (IRI/rutting/thermal cracking)thin overlay (2" or less), microsurface, chip seal$2,600,000
ResponsesZoom to Point2019LincolnWY 238 0.0012.081206008Auburn to AftonWy 238 Structure No. Csb, Cyj, Cyt, Cyw, FolPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$7,400,000
ResponsesZoom to Point2021LincolnWY 239 0.9401207001FreedomSalt River Bridge; Wy 239 Structure CsdStructure RepairWork to address structure conditions or preservationdeck overlay; deck replacement; expansion joint modification; painting; concrete repairs; riprap repairs; slope repairs; bearing device repair or replacement; damage repairs; rehabilitation to large culverts, overhead sign structures, and retaining w$300,000
ResponsesZoom to Point2021LincolnWY 89 0.00, 45.439.51217001Border Junction to IdahoUs 30, Wy 89Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$6,000,000
ResponsesZoom to Point2019Niobrara5TH ST, WY 270 100.4101401012ManvilleWy 270 Uprr 188641dRailroadProjects dealing with at-grade railroad crossingsat grade railroad crossing modifications, electrical, signs, quiet zones, circuitry$200,000
ResponsesZoom to Point2019ParkWY 290 6.06, 9.172.2171500018MeeteetseMeeteetse-Pitchfork/Wood River West SectionPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$2,500,000
ResponsesZoom to Point2020ParkWY 120 115.003.51502013Cody to MontanaSkull Creek Section; Wy 120ReconstructionWork to rebuild or expand current roadway or bridgesremoving and rebuilding roads and structures$4,100,000
ResponsesZoom to Point2024ParkWY 296 0.008.351507039Chief JosephSunlight/Swamp Lake; Wy 296Pavement ResurfaceCorrect functional pavement deficiencies (IRI/rutting/thermal cracking)thin overlay (2" or less), microsurface, chip seal$4,600,000
ResponsesZoom to Point2020ParkWY 296 41.10.11507040Chief JosephRed Grade/Two Dot SlideSlide RepairWork to address geotechnical issues dealing with landslides, rock fall, and slope movementstoe berms, mechanical slide fixes (shear keys, mechanical anchors, shear piles), rock fall mesh, rock fall mitigation, scaling
ResponsesZoom to Point2020ParkWY 296 32.50.011507041Chief JosephDip SlideSlide RepairWork to address geotechnical issues dealing with landslides, rock fall, and slope movementstoe berms, mechanical slide fixes (shear keys, mechanical anchors, shear piles), rock fall mesh, rock fall mitigation, scaling
ResponsesZoom to Point2019ParkWY 296 25.90.21507042Chief JosephForest Service ReforestationEnvironmentalProjects to address environmental issueswetland mitigation or monitoring, dust suppression, wildlife crossing, fish passage$100,000
ResponsesZoom to Point2019PlatteGILCHRIST ST, WY 316 0.1201604007WheatlandWheatland; Wy 316 Gilchrist Street Bnsf 245492lRailroadProjects dealing with at-grade railroad crossingsat grade railroad crossing modifications, electrical, signs, quiet zones, circuitry$300,000
ResponsesZoom to Point2022SheridanUS 87 BUS 0.00, 25.943.171708012SheridanCoffeen Avenue Us 87, Wy 335ReconstructionWork to rebuild or expand current roadway or bridgesremoving and rebuilding roads and structures$17,200,000
ResponsesZoom to Point2020SubletteBUDD AVE, WY 350 0.254.8051800015Big PineyBig Piney Wes; Wy 350Pavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$2,400,000
ResponsesZoom to Point2022SweetwaterUINTA DR, WY 530 0.44, 0.67, 1.6201900043Green RiverUinta And 2nd/River View/Monroe Wy 530Traffic SystemsProjects to improve traffic movements new or replacement signal poles and devices, signing, signal heads, overhead signs and structures, pedestrian crossing devices, detection$1,600,000
ResponsesZoom to Point2026TetonWY 22 5.501.52000056Wilson to IdahoLower Vehicle Arrestor; Wy 22Safety ImprovementsProjects to address vehicle crashes and safety and/or mobility of the highway systemcurve warning signs, roadway striping, no passing signs, high friction wearing surface, turn lanes, accel and decel lanes, pedestrian crossings, shoulder widenings$4,500,000
ResponsesZoom to Point2023TetonWY 22 0.01, 3.33.92000058Jackson to WilsonWy 22 Structure No. BmvReconstructionWork to rebuild or expand current roadway or bridgesremoving and rebuilding roads and structures$27,800,000
ResponsesZoom to Point2021TetonWY 22 1.6002000059Jackson to WilsonTribal Trail Connector Into Wy 22Modify IntersectionHighway and street intersection modificationsmodify intersection geometrics, signal additions or upgrades, turn lanes$1,600,000
ResponsesZoom to Point2023UintaWY 150 2.4610.382100023Evanston to UtahHilliard Flat; Wy 150 Structure No. FhgPavement RehabilitationCorrect functional and structural pavement deficienciesmill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction$4,600,000
  • 1 - 50 of 842

STIP Disclaimer

WYDOT pledges to do its best to adhere to this program and to serve the public interest through these projects. WYDOT values your input, advice, and support. Since both the nature of the projects and the funding is dynamic, and subject to many sources of change, the STIP is inherently fluid. Changes to the STIP, whether from public input, funding issues, construction cost volatility, right-of-way, environmental issues, etc., are handled on a quarterly basis, and are approved by the Transportation Commission. The quarterly addendums are posted on the WYDOT website.

Map Disclaimer

The State of Wyoming and its agencies make no express or implied warranties as to this map and the data it displays. Users of this information should review or consult the primary data and information sources to ascertain the reliability or usability of the information. The State of Wyoming and its agencies assume no liability associated with the use or misuse of this information and specifically retain sovereign immunity and all defenses available to them by law.

Notice of use

Contractor (Manufacturer/ Supplier) Name: NAVTEQ
Contractor (Manufacturer/Supplier) Address: 222 Merchandise Mart Plaza, Suite 900, Chicago, Illinois 60654
This Data is a commercial item as defined in FAR 2.101 and is subject to the Legal Notices and Terms of Use under which this Data was provided.
© 2012 NAVTEQ – All rights reserved.