Comments and Responses

  • Project Number: N/A
    Date: 08/13/2025
    Location: PO Box 121
    Cross Street: N/A
    Reference Marker: 116
    County: Carbon
    Comment Type: Comment on STIP
    221053 Project Big Creek Section State Highway 230. This section of Highway is very rough. The road won't last until 2032. Most of the winter its the only road to travel between Encampment and Laramie. Large petroleum trucks travel from Walden Area to Sinclair causing even worse damage. Please help!
    RESPONSE
    Thank you for your input. This input has been forwarded on to proper personnel.
  • Project Number: N/A
    Date: 09/04/2025
    Location: 191 N.
    Cross Street: JY Road
    Reference Marker: 5
    County: Sweetwater
    Comment Type: Comment on STIP
    Change the speed of 191 N. from milepost 3 to milepost 5 in both directions to 55 miles per hour. There is a huge increase in traffic getting on and turning off of 191 N in this area. The JY Road has a lot of traffic, getting traffic to slow down to get off to the east side of 191 at the Zip Storage entrance is almost impossible. Not only changing the speed to a slower speed but also by installing orange flags on the new speed signs, and enforcing the change is also necessary.
    RESPONSE
    Thank you for your input. This input has been forwarded on to proper personnel.
  • Project Number: N/A
    Date: 09/17/2025
    Location: Wy-220
    Cross Street: N/A
    Reference Marker: N/A
    County: Natrona
    Comment Type: Project Request
    After all of the construction that was completed on WY-220 (Poplar st), between Collins Dr and Yellowstone, storm drains were never installed. This causes flooding on the southbound lanes any time it rains. They then close a lane so it can be pumped down with, what seems to be, a sump pump. There have been cutouts in the gutters for storm drains, for months now, yet, nothing seems to be happening. I feel like completing a project for improved drainage, should actually improve things, and not make it worse.
    RESPONSE
    Thank you for reaching out with your comments regarding the storm drains on WY-220 (Poplar Street) between Collins Drive and Yellowstone. Due to some unforeseen issues at this location, the completion of the storm sewer including the outfall into the river had to be delayed. The completion of the work is scheduled to resume soon with the contractor mobilizing to the site in early October and the work should be completed by the end of November. Thank you for your patience.
  • Project Number: N/A
    Date: 09/19/2025
    Location: 30th and Bill Nye
    Cross Street: 2461 Overland Rd
    Reference Marker: N/A
    County: Albany
    Comment Type: Comment on STIP
    Hello I am the owner of a large portion of land in Laramie, Albany county. The parcel is between the proposed Bill Nye and 30st connection, as seen on one of the STIP pages and the Laramie master street plan. I can't seem to get a straight answer from anyone in over 20 years. I want to help and be involved if necessary.
    RESPONSE
    The Bill Nye Ave extension you referenced in our STIP is actually a City of Laramie project. WYDOT is involved because the funding used is Federal urban systems dollars that pass through WYDOT to the City. I gather that you may be more curious about a connection of the future 30th street to Bill Nye. I'm unaware of the City's future plans for 30th, they would be the best resource to answer that. For now, I can confirm that there is no connection shown on the plans for Bill Nye. The Bill Nye project schedule is unclear at the moment, the City is working with surrounding landowners to get all the necessary clearances.